Installation of 111 transition pieces in Denmark

Installation of transition pieces for Greater Gabbard Offshore Wind Farm (UK) by Jumbo Offshore
MT Højgaard AS, Søborg, Denmark, has awarded Jumbo Offshore the transport and installation contract for all of the 111 Transition Pieces (TP’s) for the Anholt Offshore Wind Farm (Denmark).
The 400 MW wind farm is currently being developed by DONG Energy. The Anholt Wind Farm is located in the Kattegat, near Anholt Island, and will be the largest offshore wind farm in Denmark. One of Jumbo’s DP2 Offshore Heavy Lift Vessels will install the TP’s, which will be loaded at Bladt Industries, Aalborg, on pre-installed monopiles, starting April 2012.