Ship Repair
16.06.2025
Ship Repair

Wärtsilä derating package to slash fuel use on ONE Maestro

Wärtsilä is to fit its Fit4Power derating package to the 6,700 TEU ONE Maestro. The Q1 2025 order, for delivery this month, will downsize the main engine, add turbochargers, ICC and cloud monitoring, cutting fuel by 13% and CO₂ by 4,000 tonnes per…

Ship Repair
16.06.2025
Ship Repair

Scandlines to invest over EUR 31 million in hybrid ferry conversions

Scandlines has announced an investment exceeding EUR 31 million to convert two of its ferries, Deutschland and Schleswig-Holstein, into plug-in hybrid vessels. The move is aimed at protecting the Baltic Sea and Fehmarn Belt while progressing towards…

Ship Repair
16.06.2025
Ship Repair

Wärtsilä provides regas module for Höegh Gandria conversion

Technology group Wärtsilä will supply a regasification module for Höegh Evi’s LNG carrier Höegh Gandria, which is being converted into a floating storage and regasification unit (FSRU) for Sumed, Egypt. Booked in Wärtsilä’s first quarter 2025 order…

Ship Repair
02.06.2025
Ship Repair

Besiktas shipyard launches Europe’s largest floating dock

Besiktas Shipyard has welcomed the first vessel into its new floating dock, marking a milestone in its expansion strategy. Measuring 345m in length and 70m in width, the dock is among the largest in Europe and is capable of servicing heavy vessels…

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • …
  • 119